Corporate Integrity
Insurance
New York State Contract System
Sample Forms and Instructions
DASNY BIM Standards Manual | PDF
AIA Standard | CTB
DASNY AutoCAD Export Layers | TXT
DASNY AutoCAD Import Lineweights | TXT
DASNY NavisWorks Options | XML
DASNY Revit Architectural Template | RTE
DASNY Revit Electrical Template | RTE
DASNY Revit Mechanical Template | RTE
DASNY Revit SM-PIM-FIM Template | RTE
DASNY Revit Structural Template | RTE
DASNY Standard Specification Templates
Asbestos Removal (Upstate)
Asbestos Removal (NYC)
Asbestos Removal CMM (CMM projects only)
Asbestos Removal (CUNY)
Asbestos Removal (Minor projects only)
Identification and Disposal of Hazardous Waste
Mold Remediation
Non-Liquid PCB Material Removal
Removal and Disposal of Universal Wastes
Standard Lead Abatement Specification
Underground Storage Tank Removal Specification
Waste Guidance Documents
Lead Building Material Waste Disposal
Soil Disposal
Hazardous Waste Storage and Shipment Requirements
Guidance Documents
Design Kick-Off for Environmental Impacts
Hazardous Materials Encountered During Construction Guidance
Information on Vermiculite and Asbestos Removal